TWS Audit Level

Hi,

We've been asked by an Auditor to capture the JCL changes made to the Current Plan by the Ops in the course of problem management.

I'm told this is possible but I need it confirmed and if possible the settings.

This is for Z/OS.

thanks and regards
Jon

 Lire l'article

  workloadautomation.org TWS

workloadautomation.org TWS Feed

Voir toute l'actualité

17 février 2009 : Price of Tivoli Workload Scheduler

Hi, Can anyone provide me with the following information: 1. Hardware and Software requirements for installing Tivoli Workload Scheduler in Windows environment 2. Price and Licensing information for Tivoli Workload Scheduler in Windows environment. Thanks in advance, (...)

6 décembre 2008 : 8.4 FTA with 8.2 MVS Controller

Hi, Does anyone know if the above config works? Our TWS controllers on the Mainframe are 8.2 but we need to deploy some new FTA's on Unix and Wintel, can these be 8.4? Thanks Jon

6 octobre 2008 : Exit codes from spawned processes

Hi yall, My client is running Maestro 8.2 (yes, it's true), and there's a bit of disagreement in regards to how Maestro handles exit codes from processes. If a job kicks off a process, which kicks off a process, which kicks off a process (think great-grandchildren here), does Maestro itself (...)

30 septembre 2008 : KILL vs ABEND

unsure.gif

Hi all What is the difference between KILL and ABEND in TWS 8.3? Thanks A

24 septembre 2008 : TWS Audit Level

Hi, We've been asked by an Auditor to capture the JCL changes made to the Current Plan by the Ops in the course of problem management. I'm told this is possible but I need it confirmed and if possible the settings. This is for Z/OS. thanks and regards (...)

18 septembre 2008 : http://www.tivoli-ug.org/groups?groupid=13

The UK Tivoli User Group

16 septembre 2008 : Job Scheduling Console (JSC) Questions

How can I create an external Jobstream dependency using JSC? Thanks Albert

24 août 2008 : IBM Product Introduction

The primary focus of ASAP, TWS/z products were initially developed in 1976 at the IBM Nordic Laboratories in Sweden and introduced worldwide in 1979 as OPC, an online scheduler, planning and control tool for DP operations. In 1987 OPC/A, a total rewrite and restructure, provided major new (...)